The brief was to bring the well set out plans to life on this architecturally designed three floor inner west block.
Taking six weeks to demolish the existing house and excavate the basement into rock, due to a horror run of weather it was a welcome sight to have the basement and garage slab poured. With concrete walls on the basement level supporting the first floor suspended slab it was 4.5 months into the project before the carpenters could finally get into the ground floor wall frames. The job moved rapidly from here and the finishes and eye for detail from the client gave this home such a classy look.
The client knew exactly what they wanted and they put it all together perfectly.
This combined with the strategic layout from the architect and a mix of both internal and external finishes is an interesting house all round. All rooms have their own unique style but still all feel like they’re comfortable in the home together.
“The MATTBUILD team delivered a high quality product, on program with minimal fuss.
They are hard working, experienced and provide innovative solutions to solve problems. It was a pleasure dealing with the entire team on our project. They, and their purposely selected trades are a really decent team. Their honest and open approach was appreciated by our family, our neighbours and consultants. We would recommend MATTBUILD Group to anyone considering building.”